SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 (C_TS422_2021) Free Practice Test
Question 1
Which materials have a negative quantity in a bill of materials or in a recipe?
Correct Answer: A,B,D
Question 2
How can SAP S/4HANA support a GMP-compliant production process?
Correct Answer: A,C,D
Question 3
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
Correct Answer: A
Question 4
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
Correct Answer: C
Question 5
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
Correct Answer: B
Question 6
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
Correct Answer: A,D
Question 7
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
Correct Answer: C
Question 8
What is the purpose of collective orders?
Correct Answer: C
Question 9
What does the material type influence?
Correct Answer: A,B