API Pipeline Construction Inspector (API-1169) Free Practice Test
Question 1
Removal and disposal of stumps and roots.
Correct Answer: A
Question 2
Submerged rock that is not stable.
Correct Answer: D
Question 3
Hearing protection required in areas ____________
Correct Answer: D
Question 4
Valve locations per CFR 195
Correct Answer: D
Question 5
_______________ can be used to compensate for displaced tide-water.
Correct Answer: A
Question 6
Operator Qualification (OQ), inspectors should understand the concepts including but not limited to covered tasks and evaluation of qualifications. What would be examples of covered tasks?
a) an operator digging a trench for excavation of foreign utilities
b) crew vans bringing personal to the job site on time
c) review of realignment before being issued IFC
d) management meetings
a) an operator digging a trench for excavation of foreign utilities
b) crew vans bringing personal to the job site on time
c) review of realignment before being issued IFC
d) management meetings
Correct Answer: D
Question 7
Define Quality Assurance, and who is expected to be the principal means of assuring work and material quality during field construction?
Correct Answer: D
Question 8
To eliminate potential confusion caused by lack of a response to a one call, the owners designated contact will notify the cross companies designed with a ? indicating either that there is no conflict or the line will be marked.
Correct Answer: D
Question 9
On Class 3 and 4 pipe and along major crossings, What percentage of pipe must be NDT tested?
Correct Answer: D
Question 10
Soil that breaks up easily
Correct Answer: A
Question 11
4 instruments used to inspect field bends
Correct Answer: A
Question 12
Combustible Liquids
Correct Answer: D
Question 13
A pipe _________ have to be wet down and grounded in order for a jeeping inspection to work properly.
Correct Answer: D