Question 1
The above performance report shows the earned value (EV) analysis for a program The program director performs a high-level analysis and must present a summary narrative to the steering committee What do the current findings show?
Correct Answer: C
Question 2
A multiyear program is ready to conclude. It has achieved all business objectives and is delivering its intended benefits. However the program sponsor is not willing to sign the formal program closure acceptance document and the program continues to incur operational costs.
What should the program manager do next?
What should the program manager do next?
Correct Answer: C
Question 3
The chief executive officer (CEO) informs the program manager that the delivery dale for protect A must be compressed by two months to accommodate market needs Project A relies upon deliverables from projects B and C.
Which of the following should the program manager do first?
Which of the following should the program manager do first?
Correct Answer: B
Question 4
In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provide
Correct Answer: C
Question 5
In an office area, a consultant needs to add the location of a fax machine to the plan. What is the approximated floor area that a fax machine occupies?
Correct Answer: C
Question 6
The program manager of a multinational program must reconcile data including subject matter experts* labor hour estimates and other direct resource hour estimates. In addition the program manager must prepare the cash flow analysis Which of the following should be considered to get a baseline budget?
Correct Answer: D
Question 7
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
Correct Answer: B,C
Question 8
Communicating a project's design and technical specifications to the client and stakeholders is part of the ___________of the project.
Correct Answer: D
Question 9
Which service is NOT typical of Grade 1?
Correct Answer: D
Question 10
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at the
Correct Answer: D
Question 11
In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.
Correct Answer: D
Question 12
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the
Correct Answer: C
Question 13
A program has been established and preparation is complete. Component projects are planned as a part of which of the following?
Correct Answer: C
Question 14
After meeting with the program sponsor and stakeholders, the program manager is asked by the sponsor to accelerate the program to replace two legacy financial systems. The legacy systems are at risk of premature failure.
What should the program manager do next?
What should the program manager do next?
Correct Answer: B