NCARB ARE 5.0 Project Planning & Design (PPD) (Project-Planning-Design) Free Practice Test
Question 1
Heavy steel columns and rigid connections between columns and beams
Vertical steel trusses in the external walls
Light steel columns and flexible connections between columns and beams
Vertical steel trusses in the internal walls
Which structural design concept minimizes the cost of steel structure needed to resist wind and earthquake loads in high-rise buildings?
Vertical steel trusses in the external walls
Light steel columns and flexible connections between columns and beams
Vertical steel trusses in the internal walls
Which structural design concept minimizes the cost of steel structure needed to resist wind and earthquake loads in high-rise buildings?
Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
Which of the following need to be considered to enhance the acoustic design of an office building? Check the four that apply.
Correct Answer: A,B,D,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 3
Examples of regulatory controls include which of the following elements? Check the four that apply.
Correct Answer: A,D,E,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The architect and civil engineer are coordinating the design of the proposed pedestrian plaza fronting along Sycamore Boulevard and reviewing estimates for the cost of street trees. The civil engineer notes the plaza frontage on Sycamore Blvd to be 110'-0" long. Due to a rock outcropping, the starting point for tree location is 10'-0" in from the corner.
The landscape regulations of the planned development and the street tree cost estimates are as follows:
* 'Cathedral' Live Oak: $250 per tree
* Allee Elm: $200 per tree
* American Holly: $125 per tree
What is the minimum cost for street trees along the frontage described?
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The architect and civil engineer are coordinating the design of the proposed pedestrian plaza fronting along Sycamore Boulevard and reviewing estimates for the cost of street trees. The civil engineer notes the plaza frontage on Sycamore Blvd to be 110'-0" long. Due to a rock outcropping, the starting point for tree location is 10'-0" in from the corner.
The landscape regulations of the planned development and the street tree cost estimates are as follows:
* 'Cathedral' Live Oak: $250 per tree
* Allee Elm: $200 per tree
* American Holly: $125 per tree
What is the minimum cost for street trees along the frontage described?
Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
Which of the following are characteristics of heavy-timber construction? Check the four that apply.
Correct Answer: A,D,E,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 6
An owner requests full height, motorized solar shades for the lobby curtainwall.
Click on the area of the section detail where the shade should be installed so that it is concealed from the lobby.

Click on the area of the section detail where the shade should be installed so that it is concealed from the lobby.

Correct Answer:

Explanation:
The solar shade should be installed within the ceiling recess above the curtainwall, behind the horizontal soffit-specifically in the void space between the top of the curtainwall glazing and the structural ceiling soffit (the shaded area immediately above the curtainwall glass in the section).