Autodesk Certified Professional in BIM Management for Building Design (BIM_MGT_101) Free Practice Test

Question 1
The BIM manager is conducting a health check of a design model submitted by a consultant to assess its readiness for coordination. Several model performance concerns have been raised, including long open times, sluggish navigation, and excessive file size.
Which of the following actions would best help to evaluate the model's health and identify areas of improvement?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
When working with separate Revit templates for each discipline, which elements should be standardized to support collaboration and seamless coordination across the project?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 3
During a model health check, a BIM manager notices that an international airport project's models are 1 GB each. The team has not mentioned any issues, but they did miss a recent 50% Construction Documents deadline.
What should the BIM manager do?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
For a project that is well into its Design Development phase, it is discovered that there is an easement on the property that increases the setback by 1 ft 6 in. (450 mm).
Which method for updating the geolocation of the project would be least disruptive to the extended design team?

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
A design team is distributing models to a construction team's coordinator, who reports that the various models are not aligned to each other when linked into the coordination environment.
What step should the design team's lead BIM manager take to resolve the positioning issue?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 6
During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project's clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.
For the BIM manager, what is the most appropriate next step to align clash reporting with the project's coordination strategy?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).